Explore the Agenda

Healthcare & Life Science

8:30 am Morning Check-In & Refreshments

8:50 am Chair’s Opening Remarks

Director of Modular Design Integration, BILDT

9:00 am Owner Panel: State of the Union – Prefab Adoption in Life Sciences

Construction Manager, Verista
Senior Director Engineering & Project Management, PCI Pharma Services
Director of Modular Design Integration, BILDT
  • Explore how modular clean rooms are becoming standard practice and why full volumetric modular GMP facilities remain niche but critical for speed-to-market.
  • Discuss time savings of 6–8 months with prefab vs. stick-built solutions and its impact on competitive advantage.
  • Examine supply chain constraints (e.g., HVAC lead times of 50–60 weeks) driving prefab adoption in pharma and healthcare.
  • Highlight hybrid strategies—integrating modular elements within stick-built shells for flexibility and scalability.
  • Consider union and regulatory challenges that complicate full prefab execution in healthcare and life sciences.

9:40 am Panel Discussion: State of The State and Federal AHJ’s – The Good, The Bad and the Promising

Vice President of Operations, Diversity Resources Group
VP Construction Services, ICC-NTA
Founder & President, JHS Modular Consulting
Director of Modular Design Integration, BILDT
  • Address regulatory complexity and lack of uniformity in state/local codes impacting modular adoption.
  • Share strategies for pre-construction meetings with AHJs to build trust and avoid compliance bottlenecks.
  • Explore remote inspection trends and digital QA/QC processes—opportunities and trust challenges.
  • Discuss education initiatives for AHJs, architects, and developers to improve understanding of modular processes.
  • Highlight market drivers: rural/remote healthcare projects and retail healthcare modules as prime candidates for modular solutions.

10:20 am Morning Refreshments & Networking

11:00 am Discover: Systemizing & Scaling Your Prefab Program to Expedite Project Progress

Senior Vice President, HDR Engineering
Associate Vice President, Clinical Infrastructure Development, MD Anderson Cancer Center
  • Comparing traditional vs prefab project governance to set appropriate requirements without micromanaging
  • Assessing which upfront decisions such as design approach, contract type and team selection most impact prefab viability
  • Evaluating the specific qualifications owners should look for in designers and contractors to guarantee appropriate competency in prefab abilities

11:40 am Discover: The Industrialized Construction Mandate: Accelerating Standardization in Healthcare Construction

Vice President of Manufacturing, BILDT
Chief Design Officer, Creature

Healthcare construction is at a breaking point. Rising costs, labor shortages, and mounting pressure for speed demand a radical shift. This session dives into how modular integration can rescue projects from inefficiency and chaos—by uniting owners, designers, and trade partners under a bold vision for standardization. The time for incremental change is over; the future of healthcare delivery depends on decisive action now.

  • Revolutionizing healthcare construction through modular strategies that slash timelines and reduce risk
  • Forging powerful alliances between owners, design teams, and trade partners to overcome fragmentation and accelerate adoption
  • Turning lessons into leverage—using hard-earned insights from past projects to set new benchmarks for speed and quality
  • Building resilient standards that scale across portfolios without sacrificing flexibility for specialized clinical spaces

12:20 pm Lunch Break

1:20 pm Owner/Presenter/Audience Roundtables

Director of Modular Design Integration, BILDT

Ask the Experts: In an informal, more intimate setting, you will be able to ask the questions that will enable you to impact prefab adaption the next day

  • Sit down with the Speakers: All presenters will be spread out across discussion groups to process the presentations and discussion
  • Build Relationships: Enhance your network and continue to grow information sharing across disciplines, companies and regions toward solving the construction industry’s biggest challenges
  • Get Real: Move beyond the same old themes and get to real lessons learned. This will tee up the final Owner’s Panel to focus on questions and discussion from YOU, the audience.

2:00 pm Owner Panel: What Will It Take to Get Us Where We Need to Go?

Chief Design & Construction Officer, Encompass Health
Assistant VP, Capital Productivity Improvement & Strategy, HCA Healthcare
Director of Corporate Construction Management, McLaren Health Care Corporation
Director of Modular Design Integration, BILDT
  • Breaking Barriers & Overcoming Resistance: Address fears around cost, quality, and failure; Strategies include education, factory visits, and strong leadership champions.
  • Lessons Learned & Practical Strategies: Build trust internally, find regional partners, manage union concerns, and leverage modular for prototyping and operational alignment.
  • Future Vision – The Blue Ocean: Define the ideal state: systemic transformation, full volumetric adoption, and owner-led supply chain innovation.

2:40 pm Chair’s Closing Remarks

Director of Modular Design Integration, BILDT

2:50 pm End of Conference

Data Center & Advanced Technology
Highrise, Multifamily & Commercial