Delfin Rodrigues

BIM Senior Project Manager ENG

Seminars

Tuesday 3rd February 2026
Unlocking 40% Labor Savings through Collaborative Prefab How Streamlining Workflows Between VDC, Shop and Field Turns Chaos into Efficiency in High-Stakes Projects
1:15 pm
  • Turning design challenges into field-ready solutions through early BIM implementation of modular strategies
  • Leveraging VDC and engineering collaboration to minimize on-site labor and maximize safety
  • Real results: 40% reduction in field manpower and accelerated schedules while maintaining top-notch quality
Delfin Rodrigues is speaking at Advancing Prefabrication 2026