Axel Kruger
Chief Executive Officer ENG
Seminars
Tuesday 3rd February 2026
Unlocking 40% Labor Savings through Collaborative Prefab How Streamlining Workflows Between VDC, Shop and Field Turns Chaos into Efficiency in High-Stakes Projects
1:30 pm
- Turning design challenges into field-ready solutions through early BIM implementation of modular strategies.
- Leveraging VDC and engineering collaboration to minimize on-site labor and maximize safety.
- Real results: 40% reduction in field manpower and accelerated schedules (add number) while maintaining top-notch quality.