Engineering Transportation Ready MEP Modules for Data Centers to Accelerate Installation & Drive Project Schedules
12:45 pm - Thursday 25th February 2027
- Determining what should be modularized during the VDC and BIM phase to ensure racks are designed for fabrication, transportation, and field installation from day one
- Aligning module dimensions with trailer constraints, offsite insulation workflows, and lifting strategies to eliminate rework while improving safety and efficiency onsite
- Leveraging installation productivity data to prove how large-format modules can drive project schedules
- Applying assembly-line manufacturing principles within a purpose-built modular facility